A properly prepared fire pump room saves time at the testing and approval stage. These are general points for the contractor to review with the consultant; the final reference is always the project specification and the authorities' requirements, such as Civil Defense and the Saudi Building Code for fire protection (SBC 801).
1. Flow and pressure match
Confirm that pump flow and pressure match the approved hydraulic calculations and that the supplied model is the one in the material submittal.
2. Technical documents
Prepare pump catalogues, performance curves, certificates of origin and the warranty letter, which are usually requested at material approval and on delivery to site.
3. Controllers
Each pump controller should be wired and tested, and the pumps should start automatically in sequence: jockey, then electric, then diesel.
4. Diesel pump
Check the fuel tank, batteries, exhaust line and ventilation, which are among the most commented points during testing.
5. Testing and commissioning
Pump performance testing is carried out on site in the presence of the consultant. We support testing and commissioning for sets supplied by AZZM TOWER.